Whether your facility is commercial, industrial, retail, medical or a school, interruptions to your business (planned or unplanned) can cause serious problems due to lost production time.
Planned outages must be prepared for ahead of time, especially when there is an upgrade or any site work that could interrupt normal operations. For example, adding new electrical circuits often requires advanced planning so temporary power lines can be set up to run plant machinery and avoid unnecessary downtime.
As well, planning for any other significant repair or construction upgrade to your facility must be done ahead of time, to prepare for the impact on your team’s existing operations.
Preparing for your planned outage should include focus on managing and executing all the tasks necessary to maintain productivity, including:
To avoid unnecessary downtime, each of these steps must be expertly scheduled, coordinated, and executed to insure productivity among your team during the project.
When planned outages must occur, it’s often more productive for plant management and the production team to stay focused on their daily work instead of spending time on the steps required to prepare for the upgrade or improvement project.
Here’s how we can help: Request a , which includes a thorough review of your operation, and an Outage Assessment Report for your planning purposes.
Unplanned outages can be even more challenging, with storm damage, extended power outages, a roof collapse from heavy snows, vehicular damage to buildings, or any other major event that causes downtime for your business and employees.
Preparing for an unplanned outage should include focus on having access to the right equipment and trained personnel at a moment’s notice, including:
Delays in lining up any of these outside contractors often multiply the overall delay in getting your operations back online.
One of the biggest challenges faced by building owners and facility or plant managers during such events is getting the right people on site to start the cleanup and rebuilding process. To avoid this challenge, it’s best to have an emergency outage plan prepared ahead of time.
Here’s how we can help: Request an , which includes a thorough review of your operation, and an Unplanned Outage Preparation Plan for your planning purposes.
The best time to plan for both planned and unplanned outages is now, and the best way to prepare is to have a planned outage, emergency services, and recovery contract with an experienced repair, construction, and recovery partner in place before anything happens.
As our customer, you’ll have priority access to our entire team’s years of experience and proven track-record helping businesses and plant operations with planned and unplanned outages. With our extensive network of sub-contractors, we are available on a 24/7 basis to help your business recover from storm damage, accidents, and other events.
MAKING SURE YOU’RE READY FOR ANY SIZE EMERGENCY The single most important thing you can do to survive an emergency is...
During the 9/11 attacks in New York and Washington, DC, first responders experienced life-threatening failures in their...
Pipes burst at this health care facility, flooding the floor with inches of water. The FM360 team handled all repairs...